SIXM GLOBAL
FROM INQUIRY TO CONTAINER DISPATCH

From Inquiry to Container Dispatch

A structured 18-step journey from buyer inquiry and product development through controlled manufacturing, quality assurance and worldwide dispatch.

STEP 01

Inquiry & RFQ Handling

We capture the buyer brief, understand product requirements and confirm the information needed for costing and development.

STEP 02

Tech Pack Review & Costing

Our team reviews measurements, construction, fabrics, trims, decoration and packaging requirements to prepare a workable costing basis.

STEP 03

Quotation Submission & Negotiation

Quotation details are shared with the buyer and commercial points, specifications and quantities are clarified before confirmation.

STEP 04

Order Confirmation & PO Issuance

Approved commercial terms and production requirements are documented before the project moves into pre-production.

STEP 05

Pre-Production Meeting – PPM

The PPM confirms approved specifications, critical quality points, materials, sampling status and production instructions.

QC / QA checkpoint
STEP 06

Proto, Fit, Salesman and PP Sampling

Sampling progresses through the applicable proto, fit, salesman and pre-production stages until the approved standard is established.

STEP 07

Material Sourcing & Booking

Required materials are sourced and booked against the approved product specification, colour and quantity requirements.

STEP 08

Fabric Inspection & Lab Testing

Fabric is checked for quality, shade and relevant laboratory requirements before production use.

QC / QA checkpoint
STEP 09

Pattern Making, Grading & Marker

Approved measurements are converted into production patterns, graded sizes and cutting markers.

STEP 10

Cutting

Fabric is prepared and cut according to approved markers, shade controls and production requirements.

QC / QA checkpoint
STEP 11

Sewing & Production

Cut panels move through controlled sewing and production operations with workmanship and measurement requirements monitored.

STEP 12

In-Process Quality Control

Inline and end-line checks identify workmanship, measurement and construction issues early so corrections can be made before final inspection.

QC / QA checkpoint
STEP 13

Washing, Finishing, Embroidery & Printing

Applicable washing, finishing, embroidery and printing operations are completed against approved standards and appearance requirements.

QC / QA checkpoint
STEP 14

Final Finishing & Ironing

Garments receive final finishing, thread trimming, ironing and presentation checks before final quality inspection.

STEP 15

Final Quality Inspection – FRI

Final inspection reviews workmanship, measurements, appearance, packing readiness and applicable AQL requirements.

QC / QA checkpoint
STEP 16

Packing & Carton Making

Garments are packed according to buyer instructions, carton specifications and labelling requirements.

QC / QA checkpoint
STEP 17

Documentation & Shipment Booking

Required export documentation is coordinated and shipment arrangements are confirmed with the relevant logistics partners.

STEP 18

Container Loading & Dispatch

Loading checks confirm carton quantities, container condition, seal information and dispatch readiness before worldwide shipment.

QC / QA checkpoint

We capture the buyer brief, understand product requirements and confirm the information needed for costing and development.

Our team reviews measurements, construction, fabrics, trims, decoration and packaging requirements to prepare a workable costing basis.

Quotation details are shared with the buyer and commercial points, specifications and quantities are clarified before confirmation.

Approved commercial terms and production requirements are documented before the project moves into pre-production.

The PPM confirms approved specifications, critical quality points, materials, sampling status and production instructions.

Sampling progresses through the applicable proto, fit, salesman and pre-production stages until the approved standard is established.

Required materials are sourced and booked against the approved product specification, colour and quantity requirements.

Fabric is checked for quality, shade and relevant laboratory requirements before production use.

Approved measurements are converted into production patterns, graded sizes and cutting markers.

Fabric is prepared and cut according to approved markers, shade controls and production requirements.

Cut panels move through controlled sewing and production operations with workmanship and measurement requirements monitored.

Inline and end-line checks identify workmanship, measurement and construction issues early so corrections can be made before final inspection.

Applicable washing, finishing, embroidery and printing operations are completed against approved standards and appearance requirements.

Garments receive final finishing, thread trimming, ironing and presentation checks before final quality inspection.

Final inspection reviews workmanship, measurements, appearance, packing readiness and applicable AQL requirements.

Garments are packed according to buyer instructions, carton specifications and labelling requirements.

Required export documentation is coordinated and shipment arrangements are confirmed with the relevant logistics partners.

Loading checks confirm carton quantities, container condition, seal information and dispatch readiness before worldwide shipment.

Production Visuals

Fabric to Decoration

Purpose-specific production visuals for fabric, sampling, cutting, stitching, printing and embroidery.

Fabric

Fabric inspection and fabric rolls at SIXM GLOBAL

Sampling

Garment sampling and product development at SIXM GLOBAL

Cutting

Fabric cutting process at SIXM GLOBAL

Stitching

Garment stitching and sewing production at SIXM GLOBAL

Printing

Garment printing process at SIXM GLOBAL

Embroidery

Garment embroidery process at SIXM GLOBAL
WhatsApp Us